Car & Van Manufacturer Vehicle Lead Time Information

Due to the current worldwide shortage of semi-conductors (micro chips), all car and van manufacturers are experiencing severe stock shortages and unusually long lead times for new factory orders.
Please find some guide lead time information below from different vehicle manufacturers. These are not exact and can vary depending on the specific model and engine.
If there is a particular model that you are interested in, please contact us on 01484 866218 or enquire@truefleet.co.uk and we will provide you with the very latest information.
If you are in need of a vehicle ASAP then simply CLICK HERE to view our latest "In Stock" leasing offers.
Manufacturer | Factory Order Lead Time (estimated and subject to change) |
Alfa Romeo | Tonale = 4-6 months Giulia = 4-7 months Stelvio = 4-6 months |
Audi | A1 = 16 weeks A3 Sportback = 16-22 weeks A3 Saloon = 16-22 weeks A3 PHEV = Est. Q3 2023 A4 Saloon & Avant = 16-22 weeks A5 = 16 weeks A6 = 16-22 weeks A6 PHEV = Est. Q2 2023 A7 = 16 weeks A7 PHEV = Est. Q3 2023 A8 = 16 weeks A8 PHEV = 28 weeks minimum Q2 = 16-28 weeks Q3 SUV = 16-22 weeks Q3 Sportback = 28 weeks minimum Q3 PHEV = 28 weeks minimum Q4 e-tron = Est. Q4 2023 Q5 = 17-22 weeks Q5 PHEV = 23-27 weeks Q7 = 16 weeks Q7 PHEV = ordering closed Q8 = 16-27 weeks Q8 PHEV = ordering closed Q8 e-tron SUV = Est. Q2 2023 Q8 e-tron Sportback = Est Q3 2023 TT = 16 weeks (TTS Roadster = 23-27 weeks) R8 = 23-27 weeks E-tron = ordering closed E-tron GT = 17-22 weeks |
BMW | 1 Series = Q1 2024 2 Series Coupe = Q1 2023 2 Series Gran Coupe = Q1 2024 3 Series Saloon & Touring incl. PHEV = Q1 2023 4 Series Coupe = Q2 2023 4 Series Gran Coupe & Convertible = Q1 2023 5 Series Saloon & Touring incl. PHEV = Q1 2023 7 Series incl. i7 = Q2 2023 8 Series =Q1 2023 X1 (excl. iX1 and PHEV) = Q1 2023 X2 incl. PHEV = Q1 2023 X3 = Q1 2023 (iX3 and PHEV = Q2 2023) X4 = Q1 2023 X5 incl. PHEV = Q1 2023 X6 = Q1 2023 X7 = Q1 2023 i4 = Q2 2023 iX 40, iX 50 and M60 = Q1 2023 |
Citroen Cars | C1 = stock only, factory ordering closed C3 = 2-3 months C3 Aircross = 16 weeks C4 = 3 months C5 Aircross = 24 weeks C5 X = 3 months Berlingo Car = closed for new orders Spacetourer = closed for new orders |
Citroen Vans | Berlingo = 3-4 months (metallics add +16 weeks) Dispatch = 4-5 months (metallics add +20 week) Relay = 10 months |
Cupra | Cupra Leon 1.5TSi = 14-18 weeks Cupra Leon other = 14-28 weeks (eHybrid = 40-54 weeks) Cupra Formentor = 10-14 weeks (eHybrid = 40-54 weeks) Cupra Ateca VZ1 = 10-14 weeks Cupra Ateca VZ2 & VZ3 = 20-24 weeks Cupra Born = 20-40 weeks |
Dacia | Sandero, Duster & Jogger = up to 6 months |
DS | DS3 = 2-4 months DS4 = 2-4 months DS7 = 2-4 months DS9 = 6 months |
Fiat Cars | 500 = 17 weeks 500X = 26 weeks Panda = 24 weeks Tipo = 26 weeks |
Ford Cars | Fiesta = ordering is now permanently closed (Fiesta to be discontinued in 2023) Puma = 3-4 months Focus = New model ordering is due to open in Q1 2023 S-Max & Galaxy = ordering is now permanently closed (S-Max & Galaxy to be discontinued in 2023) Kuga = 3-4 months Mustang Mach-E = ETA TBC when Ford centrally allocate a vehicle, approx. 26 weeks Tourneo Connect = 6-7 months |
Ford Vans | Transit Connect = 4-5 months Transit Courier = 4 months Transit Custom = Ford ordering is now closed - pending the launch of the All-New Transit Custom in 2023 Transit Diesel / mHEV = Ford ordering is now temporarily closed (28/11/22) until at least Q1 2023 E-Transit = 14-19 weeks NEW Ranger = approx. 12 months |
Genesis | GV60 = 5 months |
Honda | Jazz EX = 12-14 weeks Honda E = TBA HR-V Elegenace = TBA HR-V Advance = TBA HR-V Advance Style = TBA CR-V SR and EX = 12-14 weeks |
Hyundai | i10 = 7 months i20 = 7 months (i20 N = 12 months) i30 = 10 months Bayon = 8 months Tucson Petrol = 11 months Tucson HEV = 7 months Tucson PHEV = 8 months Kona Petrol = 9 months Kona HEV = 9 months Kona EV = 9 months Ioniq 5 = 10 months NEW Ioniq 6 = 6-7 months Santa Fe Petrol/Diesel = 6 months Santa Fe HEV = 7 months Santa Fe PHEV = 7 mooths |
Jaguar | E-Pace = up to 12 months (currently unable to order all P160 / P250) F-Pace D200 / P250 / P400e R-Dynamic S & SE = up to 3 months (currently unable to order all D165) F-Pace D200 / P250 / P400e R-Dynamic HSE = 6-9 months F-Pace D300 & P400 = 9-12 months F-Pace P550 SVR = 6-9 months I-Pace = 3-6 months F-Type = 3-6 months XF and XF Sportbrake = 9-12 months |
Jeep | Renegade e-Hybrid & PHEV = 19-25 weeks Compass e-Hybrid & PHEV = 19-25 weeks Grand Cherokee PHEV = 38 weeks |
Kia | Picanto = most versions 11-24 weeks (depending on model / engine) Rio = 11-15 weeks (currently unable to order Autos) Stonic = 11 weeks (currently unable to order Autos) Ceed Hatch = 11 weeks 1.5 T-GDi Petrol ONLY (currently unable to order Diesel & Autos) Ceed Sportswagon= 29 weeks 1.5 T-GDi Petrol ONLY (currently unable to order Diesel & Autos) New XCeed = 11 weeks (PHEV = TBA) ProCeed = 20 weeks (GT Line 1.5T-GDi Manual ONLY currently available to order) NEW Niro HEV = 20-33 weeks NEW Niro PHEV = Q3-Q4 2023 NEW Niro EV 2 & 3 = 24-29 weeks NEW Niro EV 4 = 29 weeks Sportage Petrol 2WD manual = 20 weeks (PHEV and Diesel ordering is temporarily suspended) Sportage Petrol DCT Auto = Q3 2023 Sportage HEV = 24 weeks Sportage PHEV = ordering now open again, estimated delivery Q3 2023 EV6 = 36-50 weeks (depending on model) PLEASE NOTE: **Kia EV Cars only** - NO Customer order price protection is available from Kia UK for any fleet and leasing EV car orders placed on or after the 15th of June 2022. Customers need to be aware at the point of order that lease rentals are likely to increase in the event of price changes between order date and the customer delivery date. The price applied will be determined by the Kia pricing in place at the time of car arriving in stock. |
Land Rover | Defender 90 Hard Top Standard D200 = currently unable to order Defender 90 Hard Top D250 & D300 = 12-15 months Defender D250 & D300 = 9-12 months Defender P400 & P525 = 3-6 months Defender 110 Hard Top = 9-12 months Defender 110 D250 & D300 = 6-9 months (currently unable to order D250 3.0 Diesel X-Dynamic S and XS Edition / P400 3.0 Petrol XS Edition) Defender P400e & P525 = 3-6 months Defender 130 D300 = 6-9 months Defender 130 P300 & P400 = 3-6 months Discovery Sport P300e ONLY = 9-12 months (currently unable to order D165, D200 and P250) Discovery D300 = 9-12 months (currently unable to order D250) Discovery P360 = 12+ months Evoque D165 R-Dynamic S = 6-9 months Evoque D200 & P300 HST = 6-9 months (currently unable to order P200) Evoque P250 = 9+ months Evoque P300e PHEV = 3-6 months Velar D300 & P250 = up to 6 months Velar D200 & P400e= 6-9 months Range Rover Sport D300 & P400 Dynamic SE= 6-9 months (currently unable to order D300 SE / D350 First Edition / P440e SE / P510e First Edition) Range Rover Sport P440e Dynamic SE = 12-24 months Range Rover Sport P440e & P510e Autobiography = 18-24 months Range Rover Sport all others = 9-12 months Range Rover SWB D300 / P400 SE & HSE = 9-12 months (D300 / P400 Autobiography = 12-18 months) Range Rover SWB D350 SE & HSE = 12-15 months (D350 / P510e Autobiography & SV = 12-18 months) Range Rover SWB P400e = 12-18 months Range Rover SWB P530 SV = 12-18 months Range Rover SWB = currently unable to order D350 First Edition / P440e First Edition / P510e First Edition / P530 Autobiography & First Edition Range Rover LWB = 12-24 months (currently unable to order D350 First Edition / P440e First Edition / ALL P530) Range Rover LWB 7 Seat = 12-24 months |
Lexus | UX Hybrid = 8-9 months UX EV = 12+ months NX Hybrid = 12+ months NX PHEV = 7-8 months ES Hybrid = 8-9 months RX = now in run-out, new orders closed RC F = 12+ months LC = 11-12 months LC Hybrid = 8-9 months LC Convertible = 12+ months LS = 15 months |
Mazda | Most models = 4 months Mazda 2 Hybrid = 16 weeks CX-30 = 1-2 months (from close pipeline stock) |
Mercedes-Benz | Varies from 18 to 45 weeks EQC = 6 months |
MG | MG3 = 12 weeks MG4 EV SR = 12 weeks MG4 EV LR = 16 weeks MG5 EV LR = 4 weeks HS = 12 weeks HS PHEV = 12 weeks ZS = 16 weeks ZS EV = 42 weeks |
Mini | 3 Door & 5 Door Hatch = Q2 2023 Clubman, Convertible & Countryman = Q2 2023 |
Nissan | Micra = 5-6 months Juke = 2-6 months depending on model / colour Qashqai = 1-6 months depending on model / colour Leaf = 9 months Ariya = 5-6 months |
Peugeot Cars | 208 = 2-3 months (e-208 = 16 weeks) 2008 and e-2008 = 4 months 308 = 4 months (e-Hybrid = 8 months) 508 = 5 months 3008 = 5 months (e-Hybrid = 7 months) 5008 = 8 months |
Peugeot Vans | Partner = 4 months e-Partner = 6 months Expert = 4 months (+20 weeks for special paint) e-Expert = 6 months Boxer L1 / L2 = 6 months (+4 weeks for special paint) Boxer L3 / L4 = 7 months (+4 weeks for special paint) e-Boxer = 7 months |
Polestar | Polestar 2 Standard Range Single Motor = available to order from Q1 2023 Polestar 2 all others = 6 months Polestar 3 = Estimated 11-12 months |
Porsche | Most models = 12-18 months |
Renault Cars | Zoe = 4 months Clio = 3 months (E-Tech = 5 months) Captur = 4 months (E-Tech = 6 months) Megane E Tech = 4-5 months Kadjar = 4 months Arkana = 5 months |
Renault Vans | Kangoo = 3 months (E-Tech = 5 months) Trafic = 5 months Master Panel Van = 3 months (E-Tech = 5 months) Master Conversions = 4-5 months |
SEAT | Ibiza SE models = 10 weeks Ibiza others = 12-26 weeks Arona SE models = 10 weeks Arona others = 12-26 weeks Leon = Q2 2023 (eHybrid = currently removed from the range) Ateca = 10-14 weeks Tarraco = 20-28 weeks |
Skoda | Fabia Hatch = 10 to 21 weeks (1.5TSi DSG = 25+ weeks) Scala = 21 to 27 weeks (1.5TSi = 52+ weeks) Kamiq = 12 to 24 weeks (1.5TSi = 52+ weeks) Karoq = 10 to 23 weeks weeks depending on engine / gearbox Octavia Hatch = 14 to 36 weeks weeks depending on engine / gearbox (1.4 iV PHEV = not available to order) Octavia Estate =16 to 52+ weeks (1.4 iV PHEV = not available to order) Superb = 10 to 52+ weeks weeks depending on engine / gearbox Kodiaq = 12 to 31 weeks weeks depending on engine / gearbox Enyaq iV = 18 to 44 weeks (265ps 4x4 = 52+ weeks) Enyaq Coupe iV = 25 weeks |
Subaru | Impreza, Outback, Forester and EV = 6-8 months |
Suzuki | Swace = 6-8 months |
Tesla | Model 3 RWD = 2-4 weeks Model 3 Long Range 1-2 months Model 3 Performance = 1-2 months Model Y RWD = 2-4 weeks Model Y Long Range = 1-2 months Model Y Performance = 2-4 weeks Model S & X = TBA for the UK Market |
Toyota | Yaris = 18 weeks Yaris Cross = 5 months Corolla = 8 months C-HR = 14 weeks RAV4 = 45 weeks Proace City Van = 5 months HiLux = up to 12 months |
Vauxhall Cars | Corsa = 3-4 months (EV = 7 months) Astra Hatch = 4 months Astra Sports Tourer = 8 months Astra PHEV = 9 months Crossland = 3-4 months Grandland = 4-5 months (PHEV = 9 months) Mokka = 4 months (EV = 7 months) |
Vauxhall Vans | Combo Cargo = 9 months Vivaro = 7 months Movano = 5 months |
Volkswagen Cars | UP! = 12 weeks (some models have extended lead times of 16-21 weeks) T-Cross = 16 weeks (some models have extended lead times of 18-35 weeks) Taigo = 17 weeks (some models have extended lead times of 40+ weeks) T-Roc = 14-16 weeks (some models have extended lead times of 28 weeks) Polo = 24 weeks Golf = 23-28 weeks (some models have extended lead times of 28-60+ weeks) Tiguan = 29 weeks (some models have extended lead times of 40-60+ weeks) 4Motion model ordering temporarily suspended on 16/12/2022 Tiguan PHEV = 15+ months (only Elegance PHEV model is availavble to order at the moment, the others are temporarily suspended) Tiguan Allspace = 20 weeks (some models have extended lead times of 23-40+ weeks) Arteon = 12 weeks (some models have extended lead times of 18-40+ weeks) Arteon Shooting Brake = 20 weeks (some models have extended lead times of 24-40+ weeks) Arteon PHEV models = ordering has been temporarily closed by VW on 16/12/2022 due to ongoing supply chain issues Passat Estate = 20 weeks (some models have extended lead times of 32-40 weeks) Passat 1.4 PHEV = ordering has been temporarily closed by VW on 16/12/2022 due to ongoing supply chain issues Touran = 50 weeks (some models have extended lead times of 60+ weeks) ID.3 = 40 weeks ID.4 = 30 weeks (some models have extended lead times of 37-60+ weeks) - GTX Max model ordering temporarily closed on 16/12/2022 ID.5 = 33 weeks (some models have extended lead times of 36-60+ weeks) - Max Pro and Max Pro Performance model ordering temporarily closed on 16/12/2022 Touareg = 42 weeks (SEL 3.0TSi 340ps / R-Line, R-Line Tech, Black Edition and R models are all temporarily suspended from ordering) |
Volkswagen Vans | Transporter = around 12 months Crafter = 9-12 months |
Volvo | C40 = 5-10 months S60 = ordering was suspended by Volvo on 31/10/22 S90 PHEV = 9-10 months V60 = 9-10 months V90 = 9-10 months XC40 = 2-3 months XC40 Electric = 5-10 months XC60 = 7-8 months XC60 PHEV = 6-7 months XC90 Petrol/Diesel mHEV = 7-8 months XC90 PHEV = 6-7 months NEW EX90 = 16-18 months |